QUALITY & ENVIRONMENT
Quality & Environment
Management systems and environmental disclosures for both plants.
Home/Quality & Environment
COMMITMENT
Responsible production
Management systems as published by the parent company.
ISO 9001:2015
Quality management
Quality controls across manufacturing operations.
ISO 14001:2015
Environmental management
Environmental considerations in manufacturing operations.
QUALITY CONTROL
Quality checkpoints through production
01
Incoming materials
Incoming material requirements.
02
In-process control
Process and product characteristics.
03
Final products
Final inspection to project specifications.
Conceptual workflow, not an approved internal SOP.
ENVIRONMENT
For a better tomorrow
ENVIRONMENT
Public disclosures by factory
The existing subsidiary site contains environmental plans, reports and monitoring results. This preview links to the original public pages.
FAC-1 documents
FAC-2 documents
ENVIRONMENTAL DISCLOSURES
Environmental document center
Documents open the corresponding post on the current corporate site.
DAIWA PLASTICS THANG LONG
Environmental inquiryNeed more environmental information?
Select environmental information as the inquiry type.